Our locations

Select a location

Americas
EMEA
APAC

Delivering superior performance: New Atlas Grid+

With structural load capacity and ease of installation critical to the build of new, state-of-the-art data centers across the globe, ASM has announced the launch of Atlas Grid+.

Pushing the boundaries of engineering, this latest advancement in Atlas Grid+ boasts an increased maximum safe working point load of 2.2kN– resulting in a ceiling product that delivers substantially enhanced performance.

Delivering superior performance, this product features newly designed connectors that clamp over the ceiling connections, providing greater strength and stability to the overall structure. The use of a higher-grade aluminium further enhances the system’s durability.

Working alongside installers to continually improve and innovate, the ASM Engineering team has introduced several design modifications that cumulatively reduce install time and aid ease of installation.

Atlas Grid Plus Lec Knowledge Article Full Width Image Desktop En Uk

ASM understands that for contractors and installation teams, ease and speed of installation are essential. Working within tight project timelines and as part of larger teams, installers can rely on Atlas Grid+ to deliver a premium ceiling product designed for streamlined installation and exceptional performance.

Faster installation

The new design simplifies the installation process, making it quicker and more efficient due to:

  • New connectors: Redesigned to clip around the ceiling profile, with exact parts provided—no cutting required on site.
  • New clips: Spring-loaded clips securely hold ceiling tiles without screws.
  • Ribs on connectors: Aid alignment and strengthen the system.
  • Notched main runners: Ensure accurate alignment and connector positioning every time.
  • Hex washer head screws: Replace Phillips head screws for increased installation speed.

Your trusted partner in high-performance ceilings

ASM's expert Project Management team provides technical support and site visits, guiding clients through every stage of the project. 

Approximately 29.41%